RETILE
6 letters
Historical clue formulations
- Upgrade, as a backsplash — 2024-09-20
- Do over, as a bathroom floor — 2023-10-08
- Upgrade, as a shower — 2014-11-01
- Patch up, in a way, as a space shuttle — 2012-06-01
- Fix, as a bathroom floor — 2011-06-13
- Fix, as a shower stall — 2009-07-10
- Provide with new squares, perhaps — 2006-01-21
- Fix the shower wall — 1994-09-29
